PROGRAM-PROGRAM MENINGKATKAN KEMUDAHAN BEKALAN AIR ESTET- ESTET NEGERI-NEGERI SEMENANJUNG MALAYSIA TAHUN 2011-2012 SELANGOR. ZON 1A & ZON 1B

Scope of Works:
Civil and Structural Engineering Works

  • Design new 20,000 gallon of suction tank and 30,000 gallon of reservoir
  • Design and proposed new pump house
  • New pipe laying from SYABAS main tapping point to individual meter stand
    which includes:
    – 160mm OD HDPE (1230m length)
    – 150mm ND MS Pipe (1500m length)

Mechanical & Electrical Engineering Works

  • Design new booster pumping system (one duty, one standby) with capacity of 34m3/hr @ 32.2 meter head.
  • Design new electrical building services
  • Design new telemetry system to connect via signal between pump house, reservoir and SYABAS centre.

Commencement: 2011
Completion: 2013
Contract Value: RM3.6 Million
Client: Kementerian Kemajuan Luar Bandar dan Wilayah (KKLW)