Scope of work:
Pakej 1:
- Pumping Station capacity: 80MLD
- Treated Water Pumpsets – Horizontal Split Casing (HSC)
- Supply, Deliver and Lay 1200mm Dia. Mild Steel (2.3km)
- Supply, Deliver and Lay 800mm Dia. Mild Steel (1.3km)
- Supply, Deliver and Lay 750mm Dia. Mild Steel (0.4km)
- Construct Booster Pumping Station
- Construct 20 ML Suction Tank
Pakej 2:
- Supply, Deliver and Lay 800mm Dia. Mild Steel (0.9km)
- Supply, Deliver and Lay 750mm Dia. Mild Steel (0.8km)
- Construct 15 ML Balancing Reservoir
- Electrical & Instrumentation Works
- Rock Blasting
- Infrastructure (Slope, Earthwork, Road, Drainage, Street Lighting, etc.)
Pakej 3:
- Supply, Deliver and Lay 750mm Dia. Mild Steel (12.0km)
- Pipe Jacking Works
- Interconnection Works
- Infrastructure (Earthwork, Road and Drainage etc.)
Commencement: 2013
Completion: 2018
Contract Value: RM70 Million
Client: Pengurusan Aset Air Berhad